Building has been framed for the greenhouse and cement work is continuing.  Third coat was done on the vaults and the trash bottle parapets are being raised.  The planters were dug and septic lid has been put onto the flush toilet on the east side of the building.  Plumbing for the shower and toilet and grey and black water cells were done by Lou and his team. 

 guatemala framing guatemala romeo

mike earthship

guatemala plumbing

guatemala view1

guatemala view2

Read 2604 times

 

 

 

 

 

 

Earthship Malawi, Africa.

Donate Today | Get Involved earthship.com/africa
$ 13000
donation thermometer
donation thermometer
$ 1780
donation thermometer
14%
Updated
5/17/2013

Members Login

Sign in with Facebook

Top 10 Items

earthships - latest news.
Shop the Earthship Online Store (575-613-4409), visit us at the Earthship World Headquarters near Taos, NM, USA.

 

Copyright © 2012 Earthship Biotecture, LLC. All rights reserved. Terms of Use | Privacy Policy